Skip to content

Configure, sample and produce your supplement range in one place.

DAT Supply
Navigation
Profile

MOQ and Lead Times

A practical reference to minimum order quantities by format — Private Label, Personalization and Formula Adaptation, plus the Export Project minimum for delivery outside the EU, UK and US — and the planning lead time. The exact figure for your own product and pack is shown when you configure it.

MOQ and Lead Times
Private Label · Gummies (PET bottle)
From 1,000 units
Private Label · Gummies (Doypack)
From 2,500 units
Formula Adaptation · Gummies
3,000 units per SKU
Planning lead time
Around 8 weeks

What this reference covers

Each route carries its own minimum, and each format its own floor. This page sets them out side by side, names what moves them, and says where the figure for your own product is settled.

  • The minimum for each format on Private Label, Personalization and Formula Adaptation, and the Export Project minimum for delivery outside the EU, UK and US
  • What moves the MOQ — format, packaging and active stack
  • Lead-time posture — why the timeline is confirmed during order setup
  • How the route you pick flows into your order

Who this is for

  • Brand teams sizing a first Private Label order for a format
  • Product managers planning a launch budget and timeline
  • Founders deciding between Private Label, Personalization and Formula Adaptation

Catalogue MOQs are published per format and packaging, so the exact minimum for your product is shown when you configure it. Formula Adaptation is a separate route, with its own production minimum per SKU.

Sizing your first order?

Order a sample kit to validate the format and finish, then configure your order to see the minimum and price for your product.

How this connects to your order

The route you pick sets the minimum; configuring your product shows the exact figure for your format and pack.

Start an order →

Ingredient, dosage or active changes to an existing formula are Formula Adaptation, with the production minimum and timeline confirmed before you commit. A genuinely new formula, R&D, due diligence, compliance and bespoke testing are Custom Projects, reviewed individually.

By format

Minimum order quantity by format

The published starting point for each format on each route. The figure for your own product and pack is shown when you configure it.

Minimum order quantity by format and route, with the Export Project minimum for delivery outside the EU, UK and US
Format
Private Label minimum
Personalization from
Formula Adaptation production minimum
Export Project minimum
Delivery outside the EU, UK and US. The route and its minimum still apply.
Gummies (PET bottle)
From 1,000 units
From 2,500 units
3,000 units per SKU
5,000 finished retail units in total per formula, across approved flavours
Subject to the normal production minimum for each production variation.
Gummies (Doypack)
From 2,500 units
From 2,500 units
3,000 units per SKU
5,000 finished retail units in total per formula, across approved flavours
Subject to the normal production minimum for each production variation.
Powder sticks
3,000 boxes of 10 (30,000 sticks)
From 3,000 boxes
60,000 sticks per SKU
60,000 sticks per SKU
Jelly sticks
3,000 boxes of 10 (30,000 sticks)
From 3,000 boxes
60,000 sticks per SKU
60,000 sticks per SKU
Oral strips
2,500 boxes of 30 (75,000 strips)
From 2,500 boxes
5,000 boxes and at least 75,000 strips per SKU
5,000 boxes and at least 75,000 strips per SKU
  • Quantity alone never makes an order a Formula Adaptation: an unchanged catalogue formula stays Private Label at any volume, and a run above the published pricing ladder is a Private Label volume quote.
  • Standard documentation included. Independent lab testing is available on request.
  • Standard Private Label covers the EU, the UK and the US. Delivery anywhere else is handled as an Export Project, from the applicable export minimum: once commercial fit is confirmed, DAT Supply scopes the market-specific documentation, compliance, freight and payment with you, and third-party, government, legalisation and testing costs are passed through where applicable.
  • Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional.
Levers

What moves the MOQ

Three things move the minimum: the format, the pack and a change to the product. None of them is negotiated on a public page.

  • Format

    The format sets the floor: each format has its own minimum on each route. The table above gives every one.

  • Packaging

    Packaging moves the minimum within the same format — gummies in PET bottles from 1,000 units, in doypacks from 2,500 units.

  • Changes to the product

    A supported flavour, colour or existing shape on the same formula is Personalization, from 2,500 units for gummies. Ingredient, dosage and active changes to a catalogue formula move the project into Formula Adaptation, with its own production minimum per SKU; a genuinely new formula is a Custom Project.

Sequence

How the figure gets confirmed

From the route you pick to the order setup that confirms your minimum and your production slot.

  1. Step 1

    Pick the route

    The route you pick — Private Label, Personalization or Formula Adaptation — sets the minimum for your format. Formula Adaptation also adds a development and sample round before production.

  2. Step 2

    Configure or brief

    Catalogue MOQs are published per format and packaging, so the exact minimum for your product is shown when you configure it. Formula Adaptation is briefed instead: an existing DAT Supply formula, adapted against that brief.

  3. Step 3

    Confirm at order setup

    The minimum and price for your product are shown as you configure it; the production slot and timeline are confirmed at order setup.

FAQ

Frequently asked

What is the minimum order quantity?

On Private Label, gummies start from 1,000 units in PET bottles and from 2,500 units in doypacks; powder sticks at 3,000 boxes of 10 (30,000 sticks); jelly sticks at 3,000 boxes of 10 (30,000 sticks); and oral strips at 2,500 boxes of 30 (75,000 strips). Personalization starts from 2,500 units for gummies; every other format personalizes from its own Private Label minimum. Formula Adaptation production starts at 3,000 units per SKU for gummies, with its own minimum for each format. Delivery outside the EU, UK and US is an Export Project: the formula still decides the route, and the order must also meet the Export Project minimum. The minimum for your product and pack is shown when you configure it.

How long does an order take?

Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional. The production lead time is the same on every route and for every format. Formula Adaptation adds a development and sample round before production, timed separately: Sample lead time is approximately 4–8 weeks, depending on the number of sample iterations needed to reach a commercially acceptable result. The production slot is confirmed at order setup.

Are MOQ and lead time fixed once quoted?

Minimums are published per format and pack, and shown when you configure your product: changing the format or pack moves the order to that format and pack’s minimum; a supported flavour, colour or existing shape on the same formula makes it Personalization, from 2,500 units for gummies; and changing an ingredient, active or dose makes it Formula Adaptation. Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional.

Keep reading

Related guides

Next

Where to next?

Browse the reviewed catalogue, request samples, or start an order when you're ready — your DAT Supply account routes your brief through the right review step.

Quick context request

Get manufacturing context

Drop your work email and a member of the DAT team will follow up with the right context for this product. Order documents, certificates and pricing are released in your DAT Supply account.

You will receive a short confirmation email. Order documents (specification, label data, batch documents) are released in your DAT Supply account once your order is under way.

/usr/bin/bash: line 5: /tmp/hermes-snap-51302552d562.sh: No such file or directory /usr/bin/bash: line 6: /tmp/hermes-cwd-51302552d562.txt: No such file or directory