Skip to content

Configure, sample and produce your supplement range in one place.

DAT Supply
Navigation
Profile

MOQ and Lead Times

A practical reference to minimum order quantities and lead-time posture across the two private-label options. Covers the private-label catalogue and Formula Adaptation MOQ tiers and why the exact figures — and the timeline — are confirmed during order setup.

MOQ and Lead Times
Catalogue MOQ (PET jar)
From 1,000 units
Catalogue MOQ (doypack)
From 2,500 units
Formula Adaptation production
From 3,000 units
Planning lead time
Around 8 weeks

What this reference covers

Two options carry two different minimums and two different lead-time postures. This page states both, names what moves them, and says where the figure for your own product is settled.

  • The two options — private-label catalogue and Formula Adaptation — and their MOQ tiers
  • What moves the MOQ — format, packaging and active stack
  • Lead-time posture — why the timeline is confirmed during order setup
  • How the option you pick flows into your order

Who this is for

  • Brand teams sizing a first private-label order against an option
  • Product managers planning a launch budget and timeline
  • Founders deciding between the private-label catalogue and Formula Adaptation

Catalogue MOQs are published per format and packaging, so the exact minimum for your product is shown when you configure it. Formula Adaptation is a separate route, with its own production minimum per SKU.

Sizing your first order?

Order a sample kit to validate the format and finish, then configure your order to see the minimum and price for your product.

How this connects to your order

The route you pick sets the minimum; configuring your product shows the exact figure for your format and pack. Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional.

Start an order →

Ingredient, dosage or active changes to an existing formula are Formula Adaptation, with the production minimum and timeline confirmed before you commit. A genuinely new formula, R&D, due diligence, compliance and bespoke testing are Custom Projects, reviewed individually.

Options

MOQ tiers by option

The two published starting points. Which one a project sits in depends on how far the formula is from the catalogue.

Option 1Most launches

Private-label catalogue

Catalogue option, your branding and packaging — the leanest path to market.

MOQ tier
From 1,000 units
Doypack
From 2,500 units
Lead time
Around 8 weeks
  • Supported flavour, colour or existing shape options are configured on the same order, at the same unit price.
Option 2

Formula Adaptation

Start from an existing DAT Supply formula and adapt ingredients, actives, dosage, serving or compatible components. The €1,750 Formula Adaptation service includes the defined development/sample process and production quotation.

MOQ tier
From 3,000 units
Production
From 3,000 units
Lead time
Final timeline is confirmed during order setup.
  • Formula Adaptation production starts from 3,000 units per SKU; the minimum is fixed for each format (3,000 units for gummies).

These are the published minimums by option — the figure for your own format and pack is shown when you configure your product. Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional.

Levers

What moves the MOQ

Three things change the minimum inside the same option. None of them is negotiated on a public page.

  • Format

    The format sets the floor. Standard oral strips start from 2,500 boxes; other catalogue formats start at the published catalogue tier.

  • Packaging

    Packaging moves the tier within the same option — PET jar from 1,000 units, doypack from 2,500 units.

  • Active stack

    Ingredient, dosage and active changes to a catalogue formula move the project into Formula Adaptation, with its own production minimum per SKU; a genuinely new formula is a Custom Project.

Sequence

How the figure gets confirmed

From the option you pick to the roadmap that states your MOQ and your timeline.

  1. Step 1

    Pick the option

    The option you pick — private-label catalogue or Formula Adaptation — sets the starting MOQ tier and the lead-time posture.

  2. Step 2

    Configure or brief

    Catalogue MOQs are published per format and packaging, so the exact minimum for your product is shown when you configure it. Formula Adaptation is briefed instead: an existing DAT Supply formula, adapted against that brief.

  3. Step 3

    Confirm at order setup

    The minimum and price for your product are shown as you configure it; the production slot and timeline are confirmed at order setup.

FAQ

Frequently asked

What is the minimum order quantity?

MOQ depends on the option and format. The private-label catalogue starts from 1,000 units in PET jars and from 2,500 units in doypacks (standard oral strips start from 2,500 boxes); Formula Adaptation production starts from 3,000 units per SKU for gummies; the minimum is fixed for each format. The minimum for your product and pack is shown when you configure it.

How long does an order take?

Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional. It depends on the option, the packaging, raw-material availability and the production calendar at the time of order. Once your brief is reviewed, the order roadmap sets out the timeline for your specific project.

Why is the private-label catalogue not the headline?

The private-label catalogue is the fastest option and the default. Formula Adaptation carries a higher production minimum and a development/sample round, because an existing DAT Supply formula is adapted. An unchanged catalogue formula is Private Label; a change to its ingredients, actives or dosage is Formula Adaptation.

Are MOQ and lead time fixed once quoted?

Minimums are published per format and pack, and shown when you configure your product: changing the format or pack moves the order to that option’s minimum, and changing the dose makes it Formula Adaptation. Standard production lead time is approximately 8 weeks after formula/specification, artwork and payment are approved. Shipping/transit is additional.

Keep reading

Related guides

Next

Where to next?

Browse the reviewed catalogue, request samples, or start an order when you're ready — your DAT Supply account routes your brief through the right review step.

Quick context request

Get manufacturing context

Drop your work email and a member of the DAT team will follow up with the right context for this product. Order documents, certificates and pricing are released in your DAT Supply account.

You will receive a short confirmation email. Order documents (specification, label data, batch documents) are released in your DAT Supply account once your order is under way.

/usr/bin/bash: line 5: /tmp/hermes-snap-51302552d562.sh: No such file or directory /usr/bin/bash: line 6: /tmp/hermes-cwd-51302552d562.txt: No such file or directory